The building has been designed to allay the risk of flooding by raising the main floor of the building ten feet above the flood plain with a ground floor parking area designed to drain quickly and effectively.  Additionally, the town of North Beach has made concerted efforts to improve pump stations and other infrastructure to mitigate the risk of flood damage for buildings throughout town.